Sr.No. |
Name Of The Client |
Description Of Work |
1 |
M/S GEA INDIA |
FABRICATION, ERECTION, ALIGNMENT, WELDING OF STRUTURAL WORKS DMTANKS,C.W. PIPE LINE FOR STEAM TURBINE BUILIDING FOR 3X110 MW DHOLPUR GAS COMBINED CYCLE POWER PROJECT RRVUNL RAJASTHAN. |
2 |
M/S GEA INDIA |
CONSTRUCTION OF CIVIL RCC STRUTURES AND ARCHITECHRURAL WORKS INCLUDING WATER RESERVOIR OF INTAKE WELL. |
3 |
M/S BHARAT HEAVY ELECTRICAL LTD. |
HANDLING AT SITE / STORAGE YARD, TRANSPORTATION TO SITE OF WORK, ERECTION, TESTING AND COMMISSIONING OF COOLING WATER PIPING FOR 1 X 500 MW AT KPCL BELLARY. |
4 |
M/S BHARAT HEAVY ELECTRICAL LTD |
STORE/ S YARD, INCLUDING TRANSPORTATION TO SITE, ERECTION, TESTING AND COMISSIONING OF MAIN CIRCULATING WATER AND AUXILARY COOLING WATER PIPELINES WITH FITTINGS, VALVES, SUPPORTS ETC FOR 2 X 250 MW UNITS AT NTPC-SAIL-POWER CO LTD BHILAI-CHATTISGARH. |
5 |
M/S MONNET ISPAT & ENERGY LTD |
FABRICATION & ERECTION OF RAW WATER PIPELINES 41 KILOMETER OD 914 MM INCLUDING WRAP COATING OF PIPES. |
6 |
M/S BGR INDIA LTD |
FABRICATION, ERECTION /ALIGNMENT OF STRUCTURAL STEEL WORKS FOR TURBINE BUILDING, BUNKER BAY, PIPE RACKS ETC FOR 1 X 500 MW BOILER AT VTPS VIJAYWADA FOR APGENCO. |
7 |
M/S INDURE PVT LTD |
FABRICATION , ERECTION, ALIGNMENT OF COOLING WATER PIPE LINE FOR SURATGARH TPS UNIT 6N 1 X 250 MW FOR RRVUNL RAJASTHAN. |
8 |
M/S BRIDGE AND ROOF INDIA LTD |
FABRICATION AND ERECTION WORKS FOR FLARE SUPPORTING STRUCTURES, FLARE STACKE, SOUR FLARE RISER ETC FOR MECHANICAL WORKS FOR OFFSITE WORKS AT BHARAT OMAN REFINERY LTD BINA MP. |
9 |
M/S LANCO INFRATECH LIMITED |
2X507.5 MW UDIPI THERMAL POWER PLANT, YELLURE VILLAGE UDIPI DISTRICT, KARNATAKA-WORK FOR ERECTION OF IMPORTED STRUCTURES, FABRICATION AND ERECTION OF BUNKER STRUCTURES. |
10 |
M/S MACNALLY BHARAT ENGINEERING CO |
FABRICATION & ERECTION OF STRUCTURAL STEEL, SILOS, PITCH STORAGE TANKS, BINS WORKS FOR GREEN ANODE PLANT, VEDANTA, JARSUGUDA ORRISA. |
11 |
SHANDONG TIEJUN ELECTRIC POWER ENGINEERING COPMANY LIMITED |
FABRICATION & ERECTION OF CW PIPE PACKAGE FOR 2X660 MW JHAJJAR THERMAL POWER PLANT |
12 |
SICHUAN ELECTRIC POWER DESIGN & CONSULTING CO. LTD |
ESP- ERECTION, TESTING, COMMISSIONING OF UNIT#2&3 FOR WPCPL 4X 135MW POWER PLANT PROJECT |
13 |
VEDANTA ALUMINUM LIMITED |
FABRICATION & ERECTION OF 6000 MT OF PRE FABRICATED STRUCTURE FOR ALUMINIUM SMELTER EXPANSION PROJECT AT JHARSUGUDA, ORISSA. |
14 |
VEDANTA ALUMINIUM LIMITED |
STORAGE, HANDLING, FABRICATION, ERECTION, TESTING, PAINTING, COMPLETION AND HANDING OVER OF ALUMINIUM SILO AND BUTT SILO FOR ALUMINIUM SMELTER EXPANSION PROJECT JHARSUGUDA |
15 |
KIRBY BUILDING SYSTEMS INDIA LTD |
ERECTION OF ALL TYPES OF ROOF STRUCTURAL ERECTION AND ALIGNMENT WORKS COMPLETE FOR BUILIDING NO# 10 ,KIRBY J- 2727A1 M/S TOSHIBA JSW CHENNAI. |
16 |
SHAPOORJI PALLONJI & CO. LTD |
STRUCTURAL STEEL WORKS AT 2400 MW COMBINED CYCLE POWER PLANT AT SAMALKOT, A.P. |
17 |
DB POWER LTD |
UNLOADING, STORAGE, INTRA SITE TRANSPORTATION, FABRICATION, ERECTION, TESTING AND COMMISSIONING OF RIVER WATER INTAKE PIPING SYSTEM –LEANGTH 27 KM FOR 2X600 MW POWER PLANT AT BARADARHA VILLAGE, JANGJIR-CHAMPA, CHATTISGARH. |
18 |
BRIDGE & ROOF CO(I) LTD |
SUPPLY, FABRICATION & ERECTION OF FLARE STACK COMPOSITE WORKS FOR OFFSITE AND UTILITIES PROJECT OF HMEL - REFINERY AT BATHINDA |
19 |
BRIDGE & ROOF CO(I) LTD |
FABRICATION & ERECTION OF 15,000MT STRUCTURAL WORKS OF POT LINES 01 &0 2 FOR EXPANSION OF SMELTER PROJECT OF BALCO AT KORBA |
20 |
SEPCO |
CONSTRUCTION OF CIRCULATING WATER PIPE PACKAGE FOR 4X300 MW = 1200 MW BALCO CAPATIVE POWER PLANT PROJECT |
21 |
RELIANCE INFRASTRUCTURE LIMITED |
ERECTION, TESTING AND COMMISSIONING OF COAL HANDLING PLANT -MINE END FOR 6 X 660 MW SASAN ULTRA MEGA POWER PROJECT, MADHYA PRADESH |
22 |
RELIANCE INFRASTRUCTURE LIMITED |
ERECTION, TESTING AND COMMISSIONING OF COAL HANDLING PLANT -OLC (OVERLAND COAL CONVEYOR) FOR 6 X 660 MW SASAN ULTRA MEGA POWER PROJECT, MADHYA PRADESH |
23 |
RELIANCE INFRASTRUCTURE LIMITED |
ERECTION, TESTING AND COMMISSIONING OF COAL HANDLING PLANT -INPLANT FOR 6 X 660 MW SASAN ULTRA MEGA POWER PROJECT, MADHYA PRADESH |
24 |
BHARAT HEAVY ELECTRICAL LIMITED |
DESIGN, ENGINEERING, PROCUREMENT, FABRICATION & ERECTION OF MODIFIED BUNKERS AND NEW BUNKER FOR R&M / UP RATING OF 2X 110 MW (UNIT 3 & 4) OF GNDTPP BATHINDA FOR PSEB. PUNJAB |
25 |
SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION |
FABRICATION & ERECTION OF CW PIPING WORKS FOR WPCL-CG 3600 MW POWER PLANT PROJECT AT NARIYARA, JANJGIR-CHAMPA, CHATTISGARH |
26 |
BRIDGE & ROOF CO. (INDIA) LTD |
FABRICATION & ERECTION OF STRUCTURAL STEEL WORKS INCLUDING CHEQUERED PLATES, HANDRAILS, GRATINGS, ERECTION & WELDING OF PRE-FABRICATED STRUCTURAL STEEL MEMBERS INCLUDING GRATINGS & DISMANTLING OF EXISTING STRUCTURES RELATED TO CIVIL, STRUCTURAL AND UNDER GROUND PIPING WORKS FOR COKER BLOCK OF RESID-UPGRADATION PROJECT FOR CPCL MANALI REFINERY, CHENNAI. |
27 |
NCC LIMITED |
ERECTION OF LARGE DIA PIPING PACKAGE FOR NCC POWER PROJECT (2X660MW) AT NELLORE, ANDHRA PRADESH |
28 |
BRIDGE & ROOF CO, (I) LTD. |
FABRICATION,ERECTION OF MILL & BUNKER BAY STRUCTURES & PIPE RACK STRUCTURE OF UNIT NO.3 AT 3 X 660 MW LALITPUR STPS OF LALITPUR POWER GENERATION CO. LTD, DIST. LALITPUR, UTTAR PRADESH |
29 |
RELIANCE INFRASTRUCTURE LIMITED |
ERECTION, TESTING AND COMMISSIONING FOR COAL HANDLING PLANT EXPANSION PACKAGE (CHP) FOR 4 X 300 MW ROSA THERMAL POWER PROJECT AT ROSA, UTTAR PRADESH. |
30 |
AXON CONSTRUCTION PVT LTD |
LAYING OF CROSS COUNTRY PIPELINE FOR RIVER WATER FROM MAHANADI RIVER TO R.K.M. SITE FOR 4 X 360 MW UCCHPINDA POWER PLANT AT BHANDRAPILI, CHHATTISGARH |
31 |
DOSHION PRIVATE LIMITED |
2500 MM GRP PIPE LINE LAYING, ALIGNING, JOINING, HYDRO-TESTING AND HANDING OVER-IND BARATH ENERGY (UTKAL) LIMITED, SAHAJBAHAL, JHARSUGUDA, ODISHA |
32 |
DOSHION PRIVATE LIMITED |
1100 MM DIA GRP PIPE LINE TRENCHING, LAYING, ALIGNING, JOINING, HYDROTESTING AND ASSOCIATED CIVIL WORKS LIKE VALVE CHAMBERS, THRUST, BLOCKS AND HANDING OVER SKS PROJECT, RAIGARH (CHHATISGARH) |
33 |
NCC LIMITED |
ERECTION PRE FABRICATED MAIN PLANT BUILDING STRUCTURE FOR KVK NILACHAL POWER PROJECT LIMITED. |
34 |
THERMAX LIMITED ENVIRO DIVISION |
STORAGE, HANDLING, DISMANTLING, ERECTION, PAINTING, INSULATION, COMMISSIONING AND PG TESTING OF 14 NO ESP AT RINL/VSP, VISHAKAPATNAM, ANDHRA PRADESH |
35 |
BHARAT HEAVY ELECTRICALS LIMITED |
SUPPLYING (EXCLUDING BHEL SUPPLIED MATERIALS), RECEIPT, COLLECTION & HANDLING OF MATERIALS FROM BHEL/CLIENT’S WORKS/ STORES/ STORAGE YARD; TRANSPORTATION TO ERECTION SITE; PRE ASSEMBLY, ERECTION, ALIGNMENT, BOLTING/ WELDING/ FASTENING, GROUTING, TESTING, FINAL PAINTING AND HANDING OVER OF BUNKER STRUCTURES, RAW COAL BUNKERS, COAL HANDLING TRANSFER POINTS, COAL CONVEYOR GALLERIES AND ITS SUPPORTING TRESTLE OF BUNKER STRUCTURES ETC. AT SITE OF UNIT # 4 OF 2X660 MW NTPC MOUDA STPP STAGE II AT NATIONAL THERMAL POWER CORPORATION LIMITED (NTPC) , MOUDA DISTRICT:- NAGPUR MAHARASHTRA |
36 |
TPSC (INDIA) PRIVATE LIMITED. |
IBR & NON IBR PIPING ERECTION WORK FOR NTPC 2X660 MW MEJA THERMAL POWER PROJECT, INDIA |
37 |
BHARAT HEAVY ELECTRICAL LIMITED |
STRUCTURAL ERECTION WORKS LOT-2 FOR RHMS PACKAGE-1, NMDC NAGARNAR, CHATTISGARH |
38 |
THERMAX INSTRUMENTATION LIMITED |
PREASSEMBLY, ERECTION, ALIGNMENT, TESTING AND ASSISTANCE IN COMMISSIONING OF CW PIPING & PIPE RACK AND ASSOCIATED WORKS AT YOUR 2X40 MW POWER PLANT PROJECT FOR NATIONAL MINERAL DEVELOPMENT CORPORATION LIMITED, NAGARNAR, DISTRICT BASTAR, STATE CHATTISGARH |
39 |
ERECTION OF PRIMARY STRUCTURE |
ERECTION OF PRIMARY STRUCTURE, CEILING GIRDER, ROOF STRUCTURE, COAL BUNKER, PRESSURE PARTS INCLUDING BOILER INTEGRAL PIPING, BUCKSTAY’S, WIND BOXES AND REFRACTORY, WITH MATERIAL WITHDRAWAL FROM LMB STORES/FABRICATION YARD, TRANSPORTATION OF MATERIAL FROM STORES TO ERECTION AREA, PROPER HANDLING AND STORAGE OF MATERIAL AFTER TAKING MATERIAL FROM STORE, PREASSEMBLY, ERECTION, FIT UP, ALIGNMENT, BOLTING AND FASTENING/ TORQUE TIGHTENING OF HSFG BOLTS, WELDING, NDT, PRESSURE PARTS ATTACHMENT WELDING, AIR LEAK TEST, HYDRO TEST, AIR TIGHTNESS TEST INCLUSIVE OF MOUNTING VALVES, HANGERS AND SUPPORTS, ERECTION COMPLETION, COMMISSIONING ASSISTANCE FOR NUPPL,3 X660 MW GHATAMPUR TPP |
40 |
ERECTION OF SECONDARY STRUCTURE |
ERECTION OF SECONDARY STRUCTURE, GRATINGS, HANDRAILS, STEP TREADS, MILL BAY MONO RAILS , OTHER AREA MONORAIL BEAMS , CABLE TRAY STRUCTURE, ELEVATOR STRUCTURE, STAIR CASE, TOE PLATES, AIR DUCTS ALONG WITH DAMPERS, EXPANSION BELLOWS, DUCT SUPPORTS, COAL PIPING, COAL PIPING SUPPORTS, INSULATION HOUSING FRAME AND GARBAGE CHUTE WITH MATERIAL WITHDRAWAL FROM LMB STORES/FABRICATION YARD, TRANSPORTATION OF MATERIAL FROM STORES TO ERECTION AREA, PROPER HANDLING AND STORAGE OF MATERIAL AFTER TAKING MATERIAL FROM STORE, PREASSEMBLY, ERECTION, FIT UP, ALIGNMENT, BOLTING AND FASTENING/ TORQUE TIGHTENING OF HSFG BOLTS, WELDING, NDT, ERECTION COMPLETION AND SCRAP REMOVAL FOR NUPPL,3 X660 MW GHATAMPUR TPP |
41 |
PTS PHASE-I |
RENOVATION & MODIFICATION OF SEWERAGE SYSTEM AND EXTERNAL WATER SUPPLY IN PTS, TELANGANA STPP, PHASE-I (2X800MW). |
42 |
MOUDA STAGE-I |
PAINTING, WELDING AND GRATING WORKS OF OFFSITE STRUCTURES OF MOUDA STAGE-I |
43 |
UNIT-I & UNIT-II, NTPC MOUDA. |
FABRICATION, ERECTION AND WELDING WORKS IN BUNKER STRUCTURES, UNIT-I & UNIT-II, NTPC MOUDA. |
43 |
BAPL PROJECT |
30” PIPELINE LAYING MECHANICAL WORK FOR BAPL PROJECT |
44 |
NTPC LARA STPP, STAGE- 1 |
LONG TERM CONTRACT (LTC) FOR MAINTENANCE OF EQUIPMENTS OF COAL HANDLING PLANT (CHP) AT NTPC LARA STPP, STAGE- 1 (2X800MW) |
45 |
NTPC KHARGONE |
MECHANICAL MAINTENANCE OF EQUIPMENT, CONVEYOR BELT JOINING & FABRICATION WOK AT COAL HANDLING PLANT OF NTPC KHARGONE, 2X660 MW |
46 |
OBRA 'C' |
ERECTION/INSTALLATION SERVICE-BOP COMMON PACKAGE FOR OBRA 'C' (2X660MW) PROJECT. |
47 |
ULTRA SUPERCRITICAL BASED THERMAL POWER PROJECT |
RECEIPT, UNLOADING, HANDLING & TRANSPORTATION, SITE FABRICATION, ERECTION / LAYING. SITE COATING & PAINTING, SITE TESTING, COMMISSIONING & HANDOVER OF RAW WATER INTAKE PIPELINE & ITS ASSOCIATED ITEMS, CIVILL, STRUCTURAL STEEL WORKS & CROSSING OF INTAKE WATER PIPELINE WORKS FOR APPROX. 06 KM LENGTH FROM GODDA PLANT SIDE" FOR 2 X 800 MW ULTRA SUPERCRITICAL BASED THERMAL POWER PROJECT, VILLAGE.MOTIA, DIST.GODDA, STATE: JHARKHAND, INDIA |
48 |
MODA THERMAL POWER PLANT |
MECHANICAL ERECTION WORKS AS PER THE BUYER'S TECHNICAL SPECIFICATIONS FOR FGD PACKAGE FOR 2 X 660 MW MODA THERMAL POWER PLANT, MOUDA, NAGPUR, INDIA |